SGI Rackable C1000 Guida Utente Pagina 36

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 122
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 35
14 007-5688-001
2: Server Installation
Check the Node Board Setup
Use the following sections to open the top cover and check that each node board is properly
installed and all the connections have been made.
Access the Inside of the Chassis
1. Grasp the two handles on either side and pull the unit straight out until it locks (you will hear
a “click”).
2. Depress the two buttons on the top of the chassis to release the top cover as shown in
Figure 2-3.
3. Lift the top cover from the chassis.
Note: To remove the system from the rack completely, depress the locking tabs on the chassis
rails (push the right-side tab down and the left-side tab up) to continue to pull the system out
past the locked position.
Vedere la pagina 35
1 2 ... 31 32 33 34 35 36 37 38 39 40 41 ... 121 122

Commenti su questo manuale

Nessun commento