2: ISS3112-RP2 Server, MIS JBOD and IS2224 JBOD NAS System Hardware Installation
Installing the Inner Rolling Rails
1. Align the rolling rails to the chassis so that the word “FRONT” is at the front of the chassis
Note: The word “FRONT” will be upside-down on one side of the chassis, reference Figure 2-12.
Figure 2-12 Align Rails to Front
2. Locate the six support tabs along the side of the chassis (see Figure 2-13 on page 31).